What is specified. What is built. What is live.
Architecture and security specification are complete. Contract implementation is the next release phase, followed by testnet operation, shadow publication, independent review, and gated production activation.
Release progress by evidence.
The public status page separates architecture, implementation, operations, testing, and production so visitors can see exactly which evidence exists at each stage.
Architecture
Observation policy, independent validation paths, threshold authorization, destination-bound publication, activation, consumer protections, and staged release requirements are defined.
Security specification
The threat model, invariants, acceptance tests, signer-independence requirements, and operating controls are defined for implementation review.
Contract implementation
The first public implementation phase covers the oracle contract, signer tooling, relayer path, test suite, manifests, and monitoring.
Validator operations
Independent signing domains, validation implementations, market-source policy, monitoring, funding, and key-management procedures will be deployed and exercised.
Testnet and shadow operation
The complete path will be exercised against source failures, attestation-threshold loss, timestamp violations, price anomalies, and realistic degraded conditions.
Production release
Production activation follows a frozen candidate, independent security audit, remediation review, documented operating ownership, and conservative launch limits.
Every address ships with release evidence.
A deployment appears here only with its network identity, source commit, signer configuration, policy ID, interface documentation, and verification material.
Live status comes from public state.
The production status surface will read public chain state and monitoring evidence to show the health of the oracle without participating in price publication or administration.
Latest accepted and activated update identifiers
Age of the market observations behind the active price
Active signer count, attestation threshold, and required validation-path representation
Active observation and validation configuration
Fresh, degraded, stale, or paused
Reviewed release and remediation status
Verify release identity from source to address.
For each deployment, verify the network, manifest, source commit, policy ID, signer configuration, and oracle address through the published release materials before integrating.
